Fayuan
Party regulationsLawsTax documentsAbout
中文English
贵阳市城镇居住区配套养老服务设施建设管理规定

Article 7

In force

分期开发的居住区建设项目,建设单位应当将配套建设的养老服务设施安排在首期建设,并书面明确具体时间进度。确因客观原因无法安排在首期建设的,应当在住宅总规模完成50%之前同步建设完成。

Local Regulations · 贵阳市人民代表大会常务委员会 · In force from July 1, 2024

Article 6Back to full textArticle 8

Texts on this site are reproduced from theParty Regulations Library on 12371.cn, theNational Database of Laws and Regulations(General Office of the NPC Standing Committee) and theSTA Policy and Regulations Library. Party regulations and national law are two separate bodies of rules: this site searches them separately and never merges the results.

Where an electronic text differs from the standard text of the law, the standard text governs. All texts here are in Chinese, the language in which they were officially promulgated; this interface is translated but the legal texts are not. The content of this site is for reference only and does not constitute legal advice— consult a practising lawyer about any specific matter.